{"id":3160,"date":"2026-03-19T10:30:00","date_gmt":"2026-03-19T08:30:00","guid":{"rendered":"https:\/\/www.zanis.gov.zm\/?p=3160"},"modified":"2026-03-19T09:30:53","modified_gmt":"2026-03-19T07:30:53","slug":"construction-of-outpatient-department-in-lavushimanda-advances","status":"publish","type":"post","link":"https:\/\/www.zanis.gov.zm\/?p=3160","title":{"rendered":"CONSTRUCTION OF OUTPATIENT DEPARTMENT IN LAVUSHIMANDA ADVANCES"},"content":{"rendered":"\n<p class=\"MsoNormal\">CONSTRUCTION works of the Outpatient Department at Chifinshi Rural Health Centre using the Constituency Development Fund (CDF) in Lavushimanda District in Muchinga Province have reached an advanced stage.&nbsp;<\/p>\n\n\n\n<p class=\"MsoNormal\">Lavushimanda Town Council Director of Engineering, Humphrey Makabe says the works which are at 70 percent completion were funded slightly over K1.5 million under the 2025 CDF allocation.<\/p>\n\n\n\n<p class=\"MsoNormal\">Mr Makabe was speaking when a team of the Constituency Development Fund Committee (CDFC) members toured some CDF projects in Mfuwe constituency.<\/p>\n\n\n\n<p class=\"MsoNormal\">He said the works that are expected to be completed this year are aimed at boosting health care and bringing the services closer to the people.<\/p>\n\n\n\n<p class=\"MsoNormal\">Mr Makabe explained that the works at Chifinshi include the OPD building, an ablution block and a water reticulation system were funded under the 2025 CDF allocation.","protected":false},"excerpt":{"rendered":"<p>CONSTRUCTION works of the Outpatient Department at Chifinshi Rural Health Centre using the Constituency Development Fund (CDF) in Lavushimanda District in Muchinga Province have reached an advanced stage.&nbsp; Lavushimanda Town Council Director of Engineering, Humphrey Makabe says the works which are at 70 percent completion were funded slightly over K1.5 million under the 2025 CDF [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3159,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36],"tags":[],"class_list":["post-3160","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","entry","has-media"],"_links":{"self":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts\/3160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3160"}],"version-history":[{"count":1,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts\/3160\/revisions"}],"predecessor-version":[{"id":3161,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts\/3160\/revisions\/3161"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/media\/3159"}],"wp:attachment":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}