{"id":1694,"date":"2026-01-16T16:09:53","date_gmt":"2026-01-16T14:09:53","guid":{"rendered":"https:\/\/www.zanis.gov.zm\/?p=1694"},"modified":"2026-01-16T16:10:39","modified_gmt":"2026-01-16T14:10:39","slug":"200-megawatt-solar-power-plant-coming-to-kafue","status":"publish","type":"post","link":"https:\/\/www.zanis.gov.zm\/?p=1694","title":{"rendered":"200-MEGAWATT SOLAR POWER PLANT COMING TO KAFUE"},"content":{"rendered":"<p>A 200-Megawatt\u00a0Solar\u00a0Power Plant, along with a transmission line connecting to ZESCO&#8217;s Kafue West Switching Station, is set to be constructed in Kafue District of Lusaka Province at a cost of approximately US$160 Million.<\/p>\n<p>AXIAN Energy Green Limited will build the plant on 300 hectares at Kudu Holding Farm, in Kabweza Ward, and will have about 300,000 panels.<\/p>\n<p>ZANIS reports that speaking during a stakeholders\u2019 engagement meeting, AXIAN Energy Green Regional Asset Manager, Joel Mwale, said the organisation is currently conducting an Environmental and Social Impact Assessment (ESIA),\u00a0with the\u00a0development\u00a0expected\u00a0to commence\u00a0upon\u00a0completion.<\/p>\n<p>&#8220;The development of this solar plant is expected to start once the study is completed,&#8221; he said.<\/p>\n<p>Mr Mwale noted that the project\u00a0will\u00a0create\u00a0about\u00a0150\u00a0jobs\u00a0for local residents during construction.<\/p>\n<p>Kafue District Commissioner,\u00a0Maurice Hikapulwe, welcomed the\u00a0investment, stating its significance\u00a0in renewable energy\u00a0and its\u00a0alignment\u00a0with the government&#8217;s commitment to increasing electricity generation and promoting economic growth.<\/p>\n<p>&#8220;If successfully implemented, the facility is expected to contribute to improved energy security, create employment opportunities both during construction and operations, and stimulate local development,&#8221; he said.<\/p>\n<p>Meanwhile, Kafue Council Chairperson,\u00a0Buumba Malambo, urged AXIAN Energy Green Limited to\u00a0prioritise\u00a0employing youth from the district once construction begins.<\/p>\n<p>&#8220;I want to appeal to you to consider employing youths from the district and ensure gender balance,&#8221; she said.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 200-Megawatt\u00a0Solar\u00a0Power Plant, along with a transmission line connecting to ZESCO&#8217;s Kafue West Switching Station, is set to be constructed in Kafue District of Lusaka Province at a cost of approximately US$160 Million. AXIAN Energy Green Limited will build the plant on 300 hectares at Kudu Holding Farm, in Kabweza Ward, and will have about [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":1695,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13,36],"tags":[26,37,25],"class_list":["post-1694","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-construction","tag-ineverycornerofzambia","tag-solarpowerplant","tag-zanis","entry","has-media"],"_links":{"self":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts\/1694","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1694"}],"version-history":[{"count":2,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts\/1694\/revisions"}],"predecessor-version":[{"id":1697,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/posts\/1694\/revisions\/1697"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=\/wp\/v2\/media\/1695"}],"wp:attachment":[{"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1694"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1694"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zanis.gov.zm\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}